Component geometry
Two side tubes meet a raised central chamber containing a visible divider. The central neck carries an external connection thread.
Material and manufacturing route
The stainless steel blank is produced by investment casting. Secondary machining completes the functional interfaces identified in the component drawing. Material identity, supply condition and acceptance requirements are agreed for the ordered component.
Finished interfaces
Machining establishes the central thread and face, side-port bores and connection ends. The divider and mating valve components are reviewed together at drawing approval.
Explore the investment casting process and the drawing and sample review workflow.
Related component guidance: CF8M, Pumps & Valves, Stainless Steels, Valve Bodies & Components.

