WF-01 · PROJECT PATH / RFQ TO DELIVERY
From RFQ to Repeat Production
A visible project path from drawing and requirement review through process selection, quotation, tooling, sampling, production, inspection and delivery.
01 · RFQ and requirement review
Send the available 2D drawing, 3D model, material specification, quantities and critical requirements. Customers do not need to select a manufacturing process before contacting Tianluping; the first review identifies likely routes and missing information.
Useful starting inputs
- Part drawing and available 3D data
- Material grade or alloy and governing standard
- Order quantity, annual forecast and delivery expectations
- Critical dimensions, datums and machined features
- Heat treatment, finish, inspection and documentation requirements
02 · Manufacturing-route review
Engineering reviews process fit, geometry, wall transitions, material, tooling, machining, finishing and verification requirements. Open technical and commercial assumptions are identified before the quotation is treated as complete.
Investment casting or die casting
Investment casting is considered for complex stainless or carbon steel geometry and near-net-shape opportunities. Die casting is considered for repeat aluminum or zinc components where alloy, projected area, geometry and volume support dedicated tooling.
03 · Quotation and scope alignment
The quotation should state the part revision, material, quantity basis, tooling, included secondary operations, inspection scope, documentation, packaging and commercial assumptions. Unresolved requirements remain open questions rather than implied commitments.
Change control
Drawing revisions, material changes, quantity changes and added inspection requirements can affect tooling, process, price and timing. Changes should be reviewed and approved before implementation.
04 · Tooling and sampling
After scope approval, tooling and process preparation begin. Samples are checked against the agreed drawing and sample plan. Tool ownership, maintenance responsibility, revision status and sample-approval evidence are recorded as required.
Sample approval
Sample approval confirms the agreed release condition; it does not remove the need for production controls. Deviations, conditions and remaining actions should be documented before repeat production.
05 · Production and process control
Production follows the released material, tooling, process and inspection plan. Incoming, in-process and final controls are applied at the points defined for the project.
Secondary operations
CNC machining, heat treatment, cleaning, finishing and other agreed operations are controlled as part of the complete route, including datum transfer and inspection after critical operations.
06 · Final inspection and delivery
Final inspection confirms the agreed characteristics and records before packaging and shipment. Material reports, dimensional reports, FAI, PPAP, traceability, labels and packaging are supplied when included in the order scope.
After delivery
Questions or nonconformances should reference the purchase order, part number, revision, lot and supporting evidence so containment and corrective-action review can begin efficiently.
Project files and confidentiality
Customer drawings and restricted project files are used for manufacturing review and project execution. Customers may request NDA discussion before sharing restricted information. Public case studies use only approved, anonymized or independently created visuals and do not disclose customer identity without authorization.
Project-specific review
Start the project path with useful inputs.
Send the available drawings, material, quantities and critical requirements. The first review will identify fit and open questions.