Case Study

CF8M Investment-Cast 90-Degree Marine Deck Drain

An anonymized CF8M marine deck-drain case covering grate-hole formation, elbow soundness, hose fit and project-specific water and salt-spray checks.

October 12, 20263 min read
Three-hole marine deck drain with perforated grate and 90-degree hose outlet

Product: 90-degree marine deck / cockpit drain, with a three-hole mounting version shown in the project photos
Material: CF8M cast stainless steel specified to ASTM A351
Route: Silica-sol investment casting, solution treatment and passivation
Application: Drainage from a vessel deck or cockpit into a connected hose

Marine deck drain requirements

The drain combines a perforated top grate, mounting flange, 90-degree outlet and barbed hose tail. For this anonymized marine-parts project, the customer wanted open grate holes, a controlled flange and hose connection, and a finish suited to the specified chloride-exposed service. The three photographs show different versions from the same project, not a before-and-after finishing sequence. The illustrated version has three mounting holes.

Another version of the marine deck drain showing perforated grate and outlet
Different version from the same project; surface appearance is not a documented processing sequence.

Investment casting and finishing response

The small grate openings and curved outlet created cleaning and casting-soundness risks. The team revised wax tooling around the openings, used solidification review to adjust feeding near the elbow, and cleared residual burrs from the grate after shell removal. The project route included solution treatment, glass-bead finishing and passivation, with limited finish machining at the flange. These operations were defined for this project under the investment casting route.

Side view of a marine deck drain version showing the 90-degree barbed hose tail
Side view of another project version, showing the bent outlet and barbed hose tail.

Verification and result

Verification included heat-level material analysis, first-article dimensional inspection, penetrant checks of production parts and radiographic review of the first-article elbow region. The assembled drain and hose connection were checked at the project’s specified 0.3 MPa water pressure for five minutes. Customer-specified neutral salt-spray samples showed no red rust after 500 hours. These results describe the tested project configuration; they do not predict service life in every seawater environment. The approved versions moved from sample confirmation into batch supply with traceable inspection records. See how project inspection scope is tied to the drawing and acceptance plan.

Engineering review

Discuss your component with Tianlu

Share the drawing, alloy, annual volume and inspection requirements for an engineering review.