PROJECT REQUIREMENT
What had to be confirmed.
The program required approximately 40,000 housings per year in four quarterly batches of about 10,000 pieces. The customer required drawing-based dimensional conformity, stable machined interfaces and a production route capable of supporting automated handling and assembly.
Leakage prevention and internal casting integrity were functional acceptance concerns. The exact service pressure, controlled dimensions and acceptance limits remain private.
MANUFACTURING CHALLENGE
What required engineering attention.
First samples did not reveal the later production issue. During assembly of the first small batch, the customer reported leakage after five machines had been assembled. The supplied evidence indicated internal porosity that became visible only after coating and machining, showing that appearance checks alone were not sufficient for the affected area.
The root-cause review considered alloy selection together with metal flow, solidification, local geometry, process control and the limitations of the original inspection route. Public copy does not attribute the issue to copper content alone and does not present any alloy as inherently free from porosity.